
Children crossing the flood-impacted barren paddy fields of North Lakhimpur, on Rongali Bihu day
Ranganadi means red river. But the Ranganadi red river of India ran
black and turbid on Rongali Bihu, the Assamese New Year’s Day, this
April.
The people living along the banks of the river in North Lakhimpur
district of Assam could not bathe their livestock in Ranganadi on this
special day. Forced to forego a tradition among the Mising tribe to
which they belong, residents bathed their cattle and goats in water
pumped up from tube wells, ignoring the dangerous level of arsenic in
the groundwater.
Red river of India
On February 9 this year, an unprecedented amount of silt and muddy
water was released from the Ranganadi dam of North Eastern Electric
Power Corporation (NEEPCO)’s 405 MW Ranganadi Hydro Electric Project
(RHEP) near Yazali in Arunachal Pradesh.
A major tributary of the Brahmaputra, Ranganadi starts in the Nilam,
Marta and Tapo mountain ranges of Arunachal Pradesh, a state in which
the river is called Panyor. It is a major source of irrigation water and
fish in both Arunachal Pradesh and downstream Assam, where it joins the
Brahmaputra.
Shortly after the sudden release of silt by NEEPCO, scores of dead
fish of different species and sizes were seen “lying at the bank of the
river at Lichi, Upper Sher, Lower Sher, Boda, Upper Jumi and Komasiki
village areas,” according to a statement by local NGO Jumi, Komasiki,
Cher Green Plus Society (JKCGPS). The NGO has lodged a complaint to the
police against the head of RHEP, holding him responsible for the
destruction of aquatic lives. It has also threatened to launch a
movement.

Bisan Narah shows the concentration of silt in the Ranganadi water since February
The
amount of silt flowing down the Ranganadi seemed unusual even for
74-year-old Bisan Narah of Shantipur village downstream. “Although the
dam releases silt from time to time for maintenance, this time the silt
and contaminants are really thick in the water. That Ranganadi dam is
like the government’s curse upon our people. In monsoons the floods have
worsened because of the dam, in winter the river dries up because of
the dam. Our paddy fields are affected by the floods and now there is no
fish in the river. The water is unusable for even washing anything.”

Ranganadi dam at Yazali, Arunachal Pradesh
When
RHEP became operational in 2001, it was hailed as the first
run-of-the-river project in North East India, which would produce
electricity without impounding water and displacing people.
But several academics in Assam have since documented that that the
channelling of the river’s water through a tunnel on the adjacent
hillside has dried up the riverbed the entire length of the channel,
effectively stopping the movement of all aquatic life up and down the
river, except in the monsoon when the torrential rain common in the area
still leads to the river breaking its banks. Guwahati-based environment
researcher Mirza Zulfiqur Rahman describes them as
“run-away-with-the-river” projects.
As with all hydroelectric projects, RHEP engineers have to get rid of
the silt before the water hits the turbine blades – the silt would ruin
the blades otherwise. So the water is led to a settlement chamber from
which the silt is periodically flushed out and dumped on the riverbed
below the dam. It was this dump that was flushed out on February 9 by
opening the dam gates. The result is a river that still flows black and
turbid.
Women Water Users’ Groups

Women Water Users’ Group of Joinpur Village in a meeting [image by: Shailendra Yashwant]
There
are many traditional new year’s day festivities slated for the day, but
it is also a holiday, so there is a meeting of the local Women Water
Users’ Group (WWUG) convened by the
Transboundary Rivers of South Asia
(TROSA) programme of the NGO Oxfam in Joinpur village, a stone’s throw
from the recently rebuilt embankments that are supposed to protect the
village from rising waters of the Ranganadi during the flood season.
Recalling the incidents that led to the current predicament, the
women recount how the RHEP was scheduled for complete shutdown for
maintenance earlier this year and had indeed communicated the same to
the local authorities, who in turn passed on the information to local
communities.
Downstream community organisations like JKGPS in Arunachal Pradesh
and many other representatives from the WWUGs in Assam demanded that
before shutdown NEEPCO must select a site for dumping the silt.
NEEPCO promised a delegation of NGOs that it would not release silt
but on the night of February 9, the state-owned company opened the dam
gates releasing massive amounts of silt into the river downstream.
“Did you know that in its shutdown circular, NEEPCO said that it will
‘not take any responsibility for any loss/damage to life and property
etc. in case of any accident owing to violation of the notice.’ What
kind of company is this, and what kind of government allows them to get
away with it?” asked Rachna Padun, President of Joarkhat village WWUG.
There were many groups at the meeting.

Barnali
Taid sits next to what was her paddy farm and is now a permanent pond
due to siltation from floods, near her house in Joinpur
“They cannot blame everything on climate
change and unpredictable weather. Everyone here knows that the floods
are caused by release of excess water during peak monsoon season by the
dam. When they do, the water comes with really great force, greater than
the normal rise of the river during monsoon. Last year 11 houses in our
villages were washed away because the force of water breached the
embankments. But no one took any responsibility,” said Barnali Taid ,
WWUG’s water champion from Jurkha Dambigual village.
After last year’s floods that killed 11 people, the outrage against the dam forced NEEPCO to make a statement,
claiming that the situation would have been much worse without the dam.
The claim has been contested by scientists and downstream communities
alike.
![Aruna Das pointing to where the embankment breached during the floods of 2017 in Joinpur, North Lakhimpur, Assam [image by: Shailendra Yashwant]](https://www.thethirdpole.net/wp-content/uploads/2019/05/ArunadasJoinpur-1.jpeg)
Aruna
Das points out where the embankment breached during the floods of 2017
in Joinpur, North Lakhimpur, Assam
“We
haven’t had a chance to rehabilitate our rice farms that are destroyed
in successive floods. We seem to be building and rebuilding every year
and all the dam does is make some electricity that we will never benefit
from,” said Aruna Das, an Aanganwadi (government-run creche) teacher
and survivor of the 2017 floods that washed away her house and all their
belongings. “We don’t have any factories, so we now grow one crop of
rice and a few vegetables. Many farmers have tried pisciculture, but the
floods level it all, even the fish farm tanks, year after year. That
dam has made our lives impossible.”
“We are supposed to trust these embankments, but they have breached
time and time again. The force of water when dam releases it together
with the rains is too much for the embankments,” she pointed out.
“What is the point of making electricity, when there is no water to
drink or food to eat and when we are living in the constant fear of our
houses being washed away?” asked Barnali Taid. “The least they can do is
to give us an early warning. Everyone knows that the floods are caused
by the dam. The dam authorities should alert us before they release the
water, so we have time to react, at least take our children and cattle
to higher ground.”

The new embankment on the Ranganadi river near Joinpur
Women seek role in decision making
At the Joinpur meeting, the WWUGs prepared a charter of demands that
they wish to present to the district commissioner, with whom they are
seeking an appointment to appraise him of their problems.
Clean drinking water tops the list, in a region severely affected by
arsenic contamination of groundwater. That is followed by a long list of
dam-induced problems for which they seek redressal – clean-up of the
river from the ongoing contamination, an early warning system in the
flood season, reparations for agricultural and fisheries losses to
floods and inclusion of women in dam, floods and embankment maintenance
related meetings at the district level.
After more animated talk, the women decided to reiterate the last
demand in the introduction. “Women’s water related work is invisible in
the current water paradigm though women are primary victims of
degradation of nature and water scarcity,” said Gita Rani Bhattacharya,
director of the Mahila Samata Society of Assam. “Water entitlements,
water technology and infrastructure and voice or decision making in the
water related institutions are mostly vested in men.”
“There are hardly any men in the villages, as all the young and able
bodied have migrated out for work due to failure of agriculture and
fishing here in Lakhimpur. Clearly there is a need to empower women to
participate in water related decision-making,” said Vinuthna Patibandla,
Oxfam India’s programme officer. “As part of the TROSA programme, we
have formed Women Water Users’ Groups in 21 villages. They are an
integral part of the village development management committee of the
Panchayat, and interacts with district officials on matters relating to
water governance.”
While leaving the meeting, Aruna Das asked a question that is on
everyone’s mind but rarely expressed. “If these are the difficulties due
to one small dam on Ranganadi, what will happen when a much bigger dam,
the 2,000-megawatt dam on the Subansiri river, is made operational?”
Barnali Taid is quick to respond, “First let the women take control
of this situation. Then we will deal with the big dam.” Everyone giggles
at the phrase “take control” as they disperse to resume new year
celebrations.
Continue reading the full article..
click here